When the big earthquake comes, this is where you want to be. Perhaps the most advanced seismic designed structure in Utah, this LEED Platinum, net-zero facility houses Salt Lake City’s Police, Fire, and Central Dispatch emergency operations for the region. Designed to be “operational” after a major seismic event the performance criteria for this structure eclipses the design for even essential facilities. As the winner of the 2013 Utah Project of the Year this inspirational architectural design combined with the ability to resist blast forces and mother nature this structure truly has it all. This project has won several other awards as well.
Location
Salt Lake City, Utah
Design Partner
GSBS Architects | MWL Architects
General Contractor
Okland Construction