Dunn Associates, Inc. performed seismic retrofit cost studies of 95 district owned buildings within a six-week period. The study involved the review of drawings, site visits, and exhaustive cost analysis utilizing FEMA 156 and 157 Standards in addition to Professional Cost Estimating Models. Results of study were used for defense of asset establishment and allocation during arbitration hearings between the original Jordan and the newly established Canyons School Districts.
Location
Jordan & Canyons Districts
General Contractor
Multiple