Tyson Case Ready Facility is a design-build project with primarily Steel and Masonry construction. Insulated metal panels are being used as the main shell with Buckling Restrained Brace Frames and Masonry Shear Walls for the main force resisting systems. This project has required extensive coordination with many disciplines with teams across the country. We have had to accommodate multiple specialty MEP teams and handle changes in a timely and cost effective manner with the contractor. The project has also had to accommodate special security precautions including ballistic walls for the main entrance.
Location
Eagle Mountain, Utah
Design Partner
GSBS Architects
General Contractor
Big-D Construction